260B Blower / 280BV Blower Vacuum
9
Original Instructions Version July 12
Important
Blower tube installation affects both blower Balance and performance! The tube and
Nozzle are correctly installed when the label “TOP” is visible to the operator during normal
operation.
Fit the tapered blower tube over the
straight blower tube, aligning the channels
in the tube over the locking pins.
Twist the tapered blower tube tube to
engage the locking pins as illustrated.
Note the tapered discharge chute is
marked with a TOP side.
Summary of Contents for 260B
Page 13: ...260B Blower 280BV Blower Vacuum 13 Original Instructions Version July 12 Starting the Machine...
Page 23: ...260B Blower 280BV Blower Vacuum 23 Original Instructions Version July 12...
Page 24: ...260B Blower 280BV Blower Vacuum 24 Original Instructions Version July 12...
Page 25: ...260B Blower 280BV Blower Vacuum 25 Original Instructions Version July 12...