3/28
ENGLISH
WE RECOMMEND
1. Use protective gloves during assembly. Be careful not to get cut when you connect
profiles.
2. At least 2 people are needed to set up and take down the tent. We recommend
asking the 3rd person for help while installing the middle pole.
3. In order to make setting up easy, the components have been given stickers. Connect
the elements according to the stickers.
4. It is advised to clean the frame before folding it, failure to do so might damage the
frame. Our company is not taking any responsibility for any damages occurring as a
result of folding a dirty frame.
5. The fabric (roof and sidewalls) should be cleaned and dried before packing it into
transport bags. Our company does not bear any responsibility for possible stains
arisen as a result of storing wet or dirty fabric.
6. For care instruction see conservation manual.
7. To remove the pins and anchors, we recommend that you use an instrument (that is
not included in the standard tent equipment)
SAFETY
1. The Dome tent is not designed to be used during strong wind, snow storm,
hailstorm, storm, etc.
2. The tent must not be left without any supervision.
3. The tents are not adapted to exploitation under snow load. One should remove the
DOME – MANUAL
Figure 1. Dome M5 tent component list
Figure 1. Dome M6 tent component list
Summary of Contents for DOME M5
Page 1: ...EN l DE l LT l CZ l PL DOME MANUAL l GEBRAUCHSANWEISUNG l INSTRUKCIJA l NÁVOD l INSTRUKCJA ...
Page 5: ...5 28 ENGLISH Figure 3 Installation sequence of Dome M5 tent ...
Page 6: ...6 28 ENGLISH Figure 4 Installation sequence of Dome M6 tent ...
Page 10: ...10 28 DEUTSCH Zeichnung 3 Aufbau des Dome M5 Zeltes ...
Page 11: ...11 28 DEUTSCH Zeichnung 4 Aufbau des Dome M6 Zeltes ...
Page 15: ...15 28 LIETUVOS Pav 3 Montavimo eiga Dome M5 ...
Page 16: ...16 28 LIETUVOS Pav 4 Montavimo eiga Dome M6 ...
Page 20: ...20 28 ČESKÝ Obrázek 3 Montáž stanu DOME 5 ...
Page 21: ...21 28 ČESKÝ Obrázek 4 Montáž stanu DOME 6 ...
Page 25: ...25 28 POLSKI Rys 3 Przebieg montażu Dome M5 ...