
33/1531-ANF 901 43 Uen C 2017-03-28
User Guide
Site Survey Tool for DECT
13
Figure 7. LED on IPBS4x2/IPBS2
Figure 8. LED deployment indications on IPBS4x2/IPBS2
16
Use the GUI web interface on base station B and check the signal strength on
the actual synchronization coverage and name it X.
17
Perform an RFP scan. If there are other DECT systems that are stronger than
(X-6) dBm, move base station B closer to base station A and then repeat from
step 10 above. For example, if X = -80 dBm then there must be no other DECT
systems that are stronger than -86 dBm.
4.4 TO PERFORM MEASUREMENTS FOR OTHER BASE
STATIONS
18
Move base station A to the position where base station B is located.
19
Place base station B on the next planned position.
20
Repeat from step 7 above.
LED
IPBS2
Deployment:
Good sync
mode and has good air sync
The IPBS4x2/IPBS2 is in deploy
coverage.
Deployment:
Bad sync
The IPBS4x2/IPBS2 is in deploy
mode and does not have
adequate air sync coverage.
Deployment:
No sync
mode and has no air sync
The IPBS4x2/IPBS2 is in deploy
coverage.
2000 ms blue, 400 ms yellow.
400 ms blue, 600 ms off, 400 ms blue,
600 ms off, 400 ms yellow.
2000 ms red, 400 ms yellow.