background image

Gen III Tankless Misting Unit – Recommended Maintenance Procedures 

 

MistAway

® 

Systems © 2010 

 

 

Gen III Tankless Unit - Recommended Maintenance Procedures 

 

   With Each Fill 

  If using a water-based insecticide, no maintenance to the unit should normally be required 

with each refill. 

  If using an oil-based insecticide, follow the instructions in the Annual Maintenance 

Requirements with each refill 

 

   Each Year 

1.  Remove and clean element in inlet water supply filter. 

2.  Clean batch tank and components: 

a.  Drain batch tank.  

(MAINTENANCE Menu, DRN, Press Green 

 button for 5 

seconds.  Unit will mist until batch tank is empty.) 

b.  Access batch tank: 

i.  Remove fasteners securing controller to black plastic shroud.  Feed controller 

into cavity inside unit. 

ii.  Remove black plastic shroud.  Lift off of posts and lean shroud (with pressure 

gauge tubing intact) to left. 

iii.  Remove lid from batch tank. 

c.  Clean batch tank

, wiping out any residue 

d.  Clean float switch and post

 – remove residue and confirm easy travel of float along 

post 

e.  Clean or replace filter

 on pump intake line 

f.  Replace batch tank lid, shroud and controller 

3.  Confirm dosing pump is working. 

a.  Remove controller – 

with all connections secure - out of its recession in shroud. 

b.  Execute a MANUAL MIST.

  Unit will FILL, go through an extended DOSE step, 

AGITATE and MIST. 

c.  Confirm 

dosing pump is pumping concentrate through clear tube leading to batch tank 

during DOSE step. 

Reviews: