incoming lines coupled to the object at the level of the suspension point bear the
constraining work. The incoming lines must be horizontally rigid and vertically
lexible in this case.
-
The abutting face of the load end is marked with an arrow. The arrow indicates the
direction of the load, which must be exactly perpendicular and axial to the borehole.
Tilted or eccentric load applications and transverse loads lead to measuring errors.
3.2 Selecting maximum capacity
If there is a risk of the safe load limit E
lim
being exceeded (even only temporarily, e.g. by
falling loads), mechanical limiting in load direction is required.
-
Loads exceeding the safe load limit E
lim
of the load cell may change its characteristics
or damage the load cell.
-
Loads exceeding the destructive load E
d
of the load cell can led to its mechanical
destruction.
3 Recommendations for installation
Beam Type Load Cell PR 6207
Minebea Intec
EN-7
Summary of Contents for PR 6207
Page 21: ...6 Connection Beam Type Load Cell PR 6207 Minebea Intec EN 19 ...
Page 29: ......
Page 30: ......
Page 31: ...1 6 ...
Page 32: ...2 6 ...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......