![MIMAKI ML Tiger-1800B MKII Operation Manual Download Page 122](http://html.mh-extra.com/html/mimaki/ml-tiger-1800b-mkii/ml-tiger-1800b-mkii_operation-manual_1800296122.webp)
Chapter 7 Operation, Adjustment, and Maintenance
7-2
Training to Workers (Operators)
• The personnel (operators and maintenance personnel) must participate to an on-site training by the Mimaki’s engineer and they
understand all the information provided in the operation manual (this manual), especially accident prevention and safety regulations.
• Employers are responsible for disclosing this document to all operators who operate this machine. In addition, the oper-
ator must be informed of the contents of this manual before handling this machine.
Operators
The operators must meet the following requirements:
• General education and special education to the extent that a person can understand the content and charts of this man-
ual and the messages and symbols displayed on the display of this machine correctly.
• Knowledge of both the machine and the product.
Operator Work
• Procedure of normal operation
- media feeding in this machine
- Preparation work before use
- Activate this machine
- Stop the machine
- Emergency stop
- Restart after an emergency
- Confirmation of printed media
- Cleaning up the machine and each unit
- Normal maintenance
Preparation Before Starting Work
The machinery is adjusted and tested at Mimaki.
After the installation, the personnel authorized by Mimaki performs the last adjustments and initial startup.
No further adjustment is required.
Confirmation of supply line in advance
Before the first start of the machine, the operator visually checks that all safety systems are functioning properly, check the
direction of rotation and confirm that all the drive systems are properly connected.
• In this manual, the protective symbols to be used are indicated by symbols so that they can be recognized
at a glance.
Procedure
Confirmation of supply line in advance
S
Mode
Key
Indication
Description
Reference
1
Confirm that the recovery work and the safety
equipment for the emergency situation are ready.
2
Confirm that adjustment of switching device has
been done.
3
Confirm that the charging of the machine is
finished and the media has been transported.
4
[GENERAL
SWITCH]
0 - 1
Set the position of the main power switch to 1 to
supply voltage to this machine.
5
P01 - No.1
If the white light on the push button panel (P01) is
lit, the voltage is being supplied to the machine.
6
P01 - No.3
Reset
emergency
If RESET EMERGENCY lights up, you need to
restore the reset.
7
P01 - No.3
Reset
emergency
Press and hold the RESET EMERGENCY button
until it goes out.
8
AUT
When the RESET EMERGENCY button goes out,
reset the software alarm.
End of procedure
Summary of Contents for ML Tiger-1800B MKII
Page 3: ...ii 1 2 2 4 5 6 ...
Page 6: ...v Troubleshooting 9 5 Dismantling 9 27 ...
Page 25: ...Chapter 1 Introduction 1 19 1 2 3 4 5 6 M915601 PC outlet rated label ...
Page 26: ...Chapter 1 Introduction 1 20 ...
Page 38: ...2 12 Chapter 2 Outline explanation ...
Page 50: ...4 10 Chapter 4 Installation ...
Page 120: ...Chapter 6 Basic usage 6 66 ...
Page 140: ...Chapter 7 Operation Adjustment and Maintenance 7 20 ...
Page 174: ... MIMAKI ENGINEERING CO LTD 2020 IG MM Tiger Products Install Pack 2 04 ...