Pellerin Milnor Corporation
31
How to Do a Friction Pad Replacement
BNWUUM03.T02 0000277566 A.3 A.7 A.5 3/17/20 11:57 AM Released
You must have the necessary replacement friction pads for your machine. Refer to the brake parts
document in your machine manual. You will find part numbers for components or overhaul/repair
kits. The overhaul/repair kit contains O-rings, pads, and other components.
1.
Remove power from the machine (see above notice).
2. Remove the used fluid. See
: How to Change Hydraulic Fluid and Remove (Bleed) Air from
3. Remove the two bolts that attach the caliper (
, item 9) and the two caliper halves
(
, item 3) to get access to the friction pads. Do not disconnect the hydraulic line (
, item 6).
4. If there are leaks, see
: How to Do a Caliper Overhaul, page 32
before you continue.
5. Replace each friction pad:
a. Remove the brass screw (
, item 3) that attaches the pad to the piston.
b. Attach the new pad to the piston. Tighten the screw.
c. Make sure that the screw head is fully in the recess in the pad.
6. Make sure that the connection o-rings are clean and in their positions (
, item 7).
7. Put the caliper halves in their positions on the brake assembly. Tighten the mounting bolts to
30 foot-pounds (41 Newton-meters).
8. Bleed the brake. See
: How to Change Hydraulic Fluid and Remove (Bleed) Air from the
.
9. Supply electrical power to the machine.
Summary of Contents for 42044SR2
Page 2: ......
Page 9: ...1 General Service Information Pellerin Milnor Corporation 7 ...
Page 23: ...This page intentionally blank ...
Page 43: ...2 Safety Related Components Assemblies Pellerin Milnor Corporation 41 ...
Page 51: ...3 Drive Assemblies Pellerin Milnor Corporation 49 ...
Page 59: ...Pellerin Milnor Corporation 57 Drive Base 5 Sheets 4244SP2 SM Single Motor Drive Assemblies ...
Page 87: ...This page intentionally blank ...
Page 111: ...This page intentionally blank ...
Page 114: ...112 Pellerin Milnor Corporation 6 Shell and Door Assemblies ...
Page 124: ...122 Pellerin Milnor Corporation 7 Control and Sensing Assbmlies ...
Page 128: ...126 Pellerin Milnor Corporation 8 Chemical Supply Devices ...
Page 129: ...This page intentionally blank ...
Page 136: ...134 Pellerin Milnor Corporation 9 Water and Steam Piping and Assemblies ...
Page 137: ...This page intentionally blank ...
Page 154: ...152 Pellerin Milnor Corporation 10 Pneumatic Piping and Assemblies ...