23
Chapter 4 - Installation
Startup checklist
The enclosed startup checklist guides the process of the machine installation and
checkout. The startup checklist forms must be completed and sent to Milltronics Mfg. to
activate the machine warranty. Use the startup checklist in conjunction with the
following outline when installing and setting up the machine.
Required Assembly
In some cases, parts of the machine are removed or adjusted for shipping purposes.
Qualified personnel (See the safety checklist on page 2 for qualifications) should install
and adjust as necessary according to the photos and descriptions.
Locate and install the conveyor wheel assemblies in the
conveyor support legs.
Locate the leveling bolts (1) and install on the machine.
Place the leveling pads (3) under the bolts.
Remove the various shipping hold-downs installed on the door.
Connect the remote hand controller (if equipped)
cable into the 25-pin “D-sub” connector to the
right side of the operator panel.
Connect all remaining cables to their respective plugs on the machine.