
85
TOC Curve Check
When
A TOC Curve Check should be done when the Q-Pak® pack is replaced or when TOC
values are fluctuating to ensure that the TOC values displayed are valid.
NOTE:
The TOC Curve Check can be started manually following the replacement and flushing
of the Q-Pak® pack. The System automatically performs a TOC Curve Check once per
day. So, if the TOC Curve Check is not started manually following the consumables
replacement, it will be done automatically within the next 24 hours or sooner.
Procedure
Follow the steps below to perform a TOC Curve Check.
Step
Action
Diagram
1
Go to READY Mode.
2
Select Menu.
Press
.
3
Select TOC Curve Check.
Press
.
Continued on next page
Summary of Contents for Direct 16
Page 1: ...User Manual Milli Q Direct 8 16 System...
Page 2: ......
Page 6: ......
Page 47: ...Milli Q Direct 8 16 System 47 Software Map Map...
Page 115: ......
Page 116: ...Milli Q Direct 8 16 System FTPF11486 V3 0 03 2013...