OM-261050 Page 33
7-6. Load Sense Line Bleeding (Closed Center Systems Only)
256 802-A / 265 795-A
1
Load Sense Line Bleeding
Valve
For systems utilizing closed
−
center
valving and load sensing, the load
sense line must be bled of air near
the pump. This is accomplished us-
ing the push
−
activated valve on the
load sense line.
Remove the spout cap from the
valve. Attach a 3/16 in. (4.7 mm)
tube to the spout and drain to a suit-
able container. While the unit is run-
ning, operate a crane function with
pressure below 700 psi (4.8 MPa)
and simultaneously press the valve
in. Continue this until all air is re-
moved from the line. Release valve
and replace cap.
1
Summary of Contents for ENPAK
Page 47: ...OM 261050 Page 43 10 2 Remote Panel Use With Section 10 3 248 998 1 2 6 3 4 5 7 8 9 10 11...
Page 64: ...OM 261050 Page 60 SECTION 13 DIAGRAMS Figure 13 1 Training Circuit Diagram For EnPak...
Page 65: ...OM 261050 Page 61 261 040 D...
Page 66: ...OM 261050 Page 62 257 926 C Figure 13 2 EnPak Circuit Diagram...
Page 67: ...OM 261050 Page 63 261 045 A Figure 13 3 Air Compressor Diagram...
Page 79: ...OM 261050 Page 75 Notes...
Page 94: ...OM 261050 Page 90 Notes...