![Miller CST 282 Owner'S Manual Download Page 25](http://html1.mh-extra.com/html/miller/cst-282/cst-282_owners-manual_1796104025.webp)
OM-285986 Page 19
�
Complete Parts List is available at www.MillerWelds.com
5-9.
Connecting 3-Phase Input Power
Input2 2012−05 Ref. 803 766-C / 803 942-A
= GND/PE Earth Ground
L1
2
1
L2
L3
3
3
4
5
6
7
Installation must meet all National
and Local Codes—have only quali-
fied persons make this installation.
Disconnect and lockout/tagout in-
put power before connecting input
conductors from unit. Follow es-
tablished
procedures
regarding
the installation and removal of
lockout/tagout devices.
Always connect green or green/
yellow
conductor
to
supply
grounding terminal first, and never
to a line terminal.
See rating label on unit and check input volt-
age available at site.
For Three-Phase Operation
1
Input Power Cord
2
Disconnect Device (switch shown in the
OFF position)
3
Green
Or
Green/Yellow
Grounding
Conductor
4
Disconnect Device Grounding Terminal
5
Input Conductors (L1, L2, And L3)
6
Disconnect Device Line Terminals
Connect green or green/yellow grounding
conductor to disconnect device grounding
terminal first.
Connect input conductors L1, L2, and L3 to
disconnect device line terminals.
7
Over-Current Protection
Select type and size of over-current protec-
tion using Electrical Service Guide (fused
disconnect switch shown).
Close and secure door on disconnect device.
Follow established lockout/tagout proce-
dures to put unit in service.
Summary of Contents for CST 282
Page 6: ......
Page 34: ...OM 285986 Page 28 SECTION 8 ELECTRICAL DIAGRAMS Figure 8 1 Circuit Diagram For CST 282...
Page 35: ...OM 285986 Page 29...
Page 40: ...Notes...