OM-244 997 Page 24
F. Installing Dust Tray Rails To Welding Table With An X-pattern Top (No Optional Tool Chest Or Optional
Tool Chest Under Solid Top)
.
Use rails and hardware that
came with the dust tray.
1
Dust Tray Rail
Use four bolts AA and four locknuts
ZZ and install dust tray rails to the
welding table. Be sure that dust tray
rails are on the inside of the
subframe assemblies.
Tighten all bolts and locknuts.
Do not install dust tray at this time.
If no optional tool chest is being
installed, proceed to
Subsection J.
If optional tool chest is being
installed, proceed to
Tools Needed:
1/2 in.
hex bit 3/16 in.
AA and ZZ
AA and ZZ
AA and ZZ
Side View
1
G. Installing Dust tray Rails To Optional Tool Chest (Dust Tray Rails Are For An X-pattern Top Only)
.
For X-pattern top, use rails that
came with the dust tray and
hardware that came with the
tool chest. Brackets included
with tool chest are not needed
with dust tray.
1
Dust Tray Rails
Use four bolts CC and install dust
tray rails to top of tool chest. Be sure
that rails are pushed in as close to-
gether as possible.
Do not tighten bolts at this time.
Do not install dust tray at this time.
CC
Tools Needed:
1
hex bit 3/16 in.