Install 12 foot Tunnel
1.
Securely attach the overhead crane to the
flip up loop on the top of the tunnel. Do
not attach the overhead crane to any other
point on the tunnel.
2.
Before positioning the tunnel to the frame,
the right and left side tunnel mounts have
to be assembled to the tunnel. Once
these are assembled, they can remain as-
sembled to the tunnel if the 12 ft tunnel is
removed.
3.
Position the right side tunnel mount on the
cab end of the tunnel, with the narrow lip
between the tunnel tubes and the other
mounting lip pointing away from the tunnel.
4.
Secure the mount to the tunnel with a
mount backing bar with nuts positioned on
the inside surface of the tunnel. Secure
the mount to the tunnel with 5/8-11 x 2
bolts and 5/8 SAE flat washers.
5.
Secure the left side tunnel mount to the
engine end of the tunnel in the same man-
ner.
6.
Lift the tunnel up with the overhead hoist
and position on the bagger frame.
7.
Insert the threaded tunnel bottom mount-
ing plates into the pockets in the frame.
8.
Lower the tunnel down and line up the
holes in the mounting brackets on each
end of the tunnel with the threaded holes
in the tunnel mount plates.
9.
Insert the 5/8-11 x 2 bolts with 5/8 SAE flat
washers through the bracket and into the
threaded holes. Tighten securely.
10. Assemble the 5/8-11 x 1-1/2 hex head
bolts and the 5/8-11 x 2 socket head
screws to the cab end and engine end
frame mounting plates. Secure in place
with 5/8-11 nylon lock flange nuts. The
outer mounting holes from the 14 ft tunnel
to the frame will not be used for the 12 ft
tunnel.
Tunnel Mounts & Plates
Summary of Contents for AG-BAG Professional LX1214
Page 20: ...14 Safety Sign and Decal Locations...
Page 21: ...15 Safety Sign and Decal Locations continued...
Page 128: ...122 Maintenance Record Date Service Performed...
Page 129: ...123 Date Service Performed...
Page 130: ...124 Date Service Performed...
Page 158: ...2014 by Miller St Nazianz Inc...