Installation onto an existing concrete oor
Installation onto ground
1. Place your letterbox in
the chosen location,
remove the base plug
and mark the mounting
hole with a pencil.
3. Place the letterbox back over the concrete hole just drilled.
To bolt the letterbox to the concrete oor, refer to the
steps below.
1. Dig a hole approximately
30cm x 35cm x 10cm deep.
2. Fill hole with concrete.
You will need to install a small concrete slab that is suitable for your
parcel letterbox to be bolted onto.
3. Use a spirit level to level the
concrete and then leave it to
fully dry.
4. Place your letterbox onto the
concrete slab, remove the
base plug and mark the
mounting hole with a pencil.
5. Drill a hole (10mm diameter x
70mm deep) into the concrete
slab for the mounting bolt.
2. Drill a hole (10mm diameter x
70mm deep) into the concrete
oor for the mounting bolt.
Vienna 2
Pillar
786
Required
- Spirit Level
- Hammer Drill
- 10mm Masonry Drill Bit
Tools
www.milkcan.com.au
(03) 9464 6964
56 Northgate Drive,
Thomastown VIC 3043
Choosing a Suitable Location
You will need to install it in a location that is easily accessible to Australia Post and couriers.
6. Place the letterbox back over the concrete hole just drilled. To
bolt the letterbox to the concrete oor, refer to the steps below.
1. Check the nut on the expansion bolt has not been tightened, it needs to be loose.
2. Insert the expansion bolt into the concrete through the hole in the base of the letterbox.
3. Tap the expansion bolt fully down. If you encounter some resistance, you may need
a hammer to tap the bolt further into the concrete.
4. Tighten the nut with the tube spanner provided. Re t the base plug.
Installation using the expansion bolt
1.0
10cm
10cm
30cm
35cm
FRONT
FRONT