en - Commissioning
44
Notes on installation
The transfer trolley must only be installed by the Miele Cus-
tomer Service Department or by a Miele authorised service dealer.
The all-pole power disconnection of the variable transfer trolley is
achieved by disconnecting the power supply.
The outer casing of the device must not be used as a deposit or stor-
age area for utensils or other objects.
The transfer trolley can only be coupled in the correct position. The
vertical position must not be changed after coupling.
The height of the transfer trolley is adjusted when the cleaning ma-
chine or conveyor system is commissioned.
Successful commissioning must be documented in a training certific-
ate. A copy of this certificate should then be filed with the supervisor.
The training certificate must also document the fact that instructions
on using the equipment were provided to users, and the names of the
users present.
The conveyor system is intended for indoor use only.
Summary of Contents for ATT 86
Page 2: ...2 de 5 en 35 da 65 fr 95 no 127 ...
Page 4: ...de Inhalt 4 Umfang der Einweisung 31 Teilnehmer 32 ...
Page 34: ...en Contents 34 Scope of training 61 Participants 61 ...
Page 62: ...en Enclosure 62 No Name Function Date Signature 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ...
Page 64: ...da Indhold 64 Omfang af instruktion 91 Deltagere 92 ...
Page 94: ...fr Table des matières 94 Contenu de la formation 123 Participants 124 ...
Page 126: ...no Innhold 126 Opplæringen omfatter 153 Deltagere 154 ...
Page 155: ......