8.
9.
Complete the middle rail by using a Long Filler Rail (B) to connect the U-Shaped Rail to the Gate Frame. Then, push
the non-swaged end of a Vertical Corner Post (F ) onto the short corner peg of each Middle U-Shaped Rail.
F
F
F
F
6.
To assemble the top rail, start at the corner closest to the Gate Frame. Use a Short Filler Rail (D) to connect the
Gate Frame to a Top U-Shaped Rail (H). Secure the long pegs of the Top U-Shaped Rail on the Vertical Corner Posts
in the front and back. Moving to the back, attach a Medium Filler Rail (C) with two swaged ends to the Top
U-Shaped Rail.
D
Swaged
B
C
H
Swaged
Swaged
Swaged