Step 1.
Rivet the dinrail #3-043-1 to 
the chassis #3-040-3.

Step 2.
Lay the black paper insulator 
#5-022-1 down with the diago-
nal corner to the upper center.

Step 3.
Screw down the negative 
busbar insulators #5-015-2 
using #6-007-1 screws. 

Alumi-

num chassis strips easily. 
Don’t over tighten.

Step 4.
Snap on the left busbar on to 
the negative insulators.

Step 5.
Screw down the right side 
busbar using #6-037-1 screws 
and #6-017-1 lock washers.

Step 6.
Loosen up the second large 
inset screw from the top of the 
right side busbar.

Step 7.
Place large black paper insula-
tor #5-021-1 in the top portion 
of box around the dinrail.

Step 8.
Place inside labels #10-008-1

MNPV6 Procedure

May 30, 2011

#5-022-1

#5-021-1

#5-021-1

Lock washer 
#10 internal tooth
#6-017-1

Lock washer 
#10 internal tooth
#6-017-1

Pan head screw 10 x 3/8

#6-007-1

Pan head screw
10-32 x 3/8
#6-036-1

Pan head screw
10-32 x 5/16
#6-037-1

Summary of Contents for MNPV6

Page 1: ...ve insulators Step 5 Screw down the right side busbar using 6 037 1 screws and 6 017 1 lock washers Step 6 Loosen up the second large inset screw from the top of the right side busbar Step 7 Place lar...

Page 2: ...side of the box The side label 10 008 1 needs to have the model number checked in this case MNPV6 which quarter of the year in this case the second quarter Q2 and the last two digits of the year the u...

Page 3: ...e secure the plastic hardware bag slip ping the busbars in the bag under the dinrail and pulling the wire tie snug Fuse adapter 5 035 1 4 x 6 Plastic bag 9 048 2 Fuse busbar 3 079 1 Breaker busbar 3 0...

Page 4: ...12 12 Step 12 Attach the label 10 008 1 on the inside of the cover 3 041 2 Make sure the cover is upside down and the label is right side up...

Page 5: ...13 Attach the deadfront secur ing the bottom first and then snapping the top in Step 14 Make sure the note 10 012 1 is in place under the cover The screw should go through the note to hold it in place...

Page 6: ...ite badge 5 029 1 in the lower right hand corner Step 17 Slide the rest of the labels 10 008 1 under the cover Step 18 Screw down the cover using a 6 017 1 lock washer and a 6 017 1 screw Make sure th...

Page 7: ...Step 19 Put unit in plastic bag that the unit originally shipped in...

Page 8: ...o end flaps down Then fold the side flap with no graphics and place glue as shown above Fold the remaining flap down and press it firmly for a few seconds to allow the glue to harden NOTE The image is...

Page 9: ...21 21 21 21 Step 21 Put padding corners in the bottom of the unit...

Page 10: ...Step 22 Put manual 10 010 1 in box...

Page 11: ...n Then fold a side flap and place glue as shown above Fold the remaining flap down and press it firmly for a few seconds to allow the glue to harden NOTE The image is a box for the MNPV3 but the proce...