Service Manual_2017-V1
9
3. Installation and commissioning
3.1 Handling
Handling
1)Protect the refrigerator in moving it,Same as shown as
left photo, please move it by handcart with cushion
2)Remove all packing materials and bottom cushion, the
n move into house for placement
3)After moving it to appropriate location, wait for 2 hours
before power on.
3.2 Door Disassembly and Assembly
The refrigerator door needs to be dismantled if it cannot enter the room in the whole.
Disassembly of Freezer door
Disassembly of Freezer door
None
Disassembly of refrigerator door
Disassembly of refrigerator door
None
3.3 Installation location
Installation location
Location that is easy for ventilation shall be chosen to
facilitate heat dissipation, enhance its performance and
reduce the energy consumption.
Summary of Contents for 22031020001681
Page 14: ...Service Manual_2017 V1 14 4 Terms 4 1 Definition of model None 4 2 Location of nameplate None ...
Page 20: ...Service Manual_2017 V1 20 7 2 Circulating route of cooling air ...
Page 38: ...Service Manual_2017 V1 38 11 Troubleshooting Method 11 1 No cooling Air cooling Electronic ...
Page 39: ...Service Manual_2017 V1 39 11 2 No working of compressor 11 3 Inside frosting no defrosting ...
Page 40: ...Service Manual_2017 V1 40 11 4 Inside frosting no defrosting Maintenance guidelines ...
Page 42: ...Service Manual_2017 V1 42 11 8 Defective defrost circuit 11 9 Noise ...