Service Manual_2017-V1
9
3. Installation and commissioning
3.1 Handling
Handling
1)Protect the refrigerator in moving it,Same as shown as
left photo, please move it by handcart with cushion
2)Remove all packing materials and bottom cushion, the
n move into house for placement
3)After moving it to appropriate location, wait for 2 hours
before power on.
3.2 Door Disassembly and Assembly
The refrigerator door needs to be dismantled if it cannot enter the room in the whole.
Disassembly of Freezer door
Disassembly of Freezer door
None
Disassembly of refrigerator door
Disassembly of refrigerator door
None
3.3 Installation location
Installation location
Location that is easy for ventilation shall be chosen to
facilitate heat dissipation, enhance its performance and
reduce the energy consumption.
Summary of Contents for 22031020000125
Page 13: ...Service Manual_2017 V1 13 4 Terms 4 1 Definition of model None 4 2 Location of nameplate None...
Page 19: ...Service Manual_2017 V1 19 7 2 Circulating route of cooling air...
Page 34: ...Service Manual_2017 V1 34 11 Troubleshooting Method 11 1 No cooling Air cooling Electronic...
Page 35: ...Service Manual_2017 V1 35 11 2 No working of compressor...
Page 37: ...Service Manual_2017 V1 37 11 5 Light is not on...