Manufacturing Test
UG0557 User Guide Revision 4.0
48
Figure 25 • Configuring the Device
7.
Click
Browse,
and select the
SEC_KIT_MTD_top.stp
file from the
Load Programming File
window.
8.
Click
Program
to program the device.
9.
Press the
SW4
switch.
The corresponding DS7 LED starts glowing, indicating that the device is programmed successfully.
8.2
Running the Manufacturing Test
This section describes how to run the manufacturing test for the SmartFusion2 Advanced Development
Board.
8.2.1
Setting Up Tera Term
To set up Tera Term for the manufacturing test:
1.
Connect one end of the mini USB to Type A USB cable to
J33,
and other end to the USB port of the
host PC.
2.
Launch
Tera Term
from the Start menu.
Figure 26 • Tera Term New Connection Window
3.
Select the
Serial
radio button.
4.
Select a port from the
Port
drop-down list, and click
OK
.