Field or Button
Description
Save
Saves changes to the active window.
Smart VacPrep Evac-
uation
This option is applicable only when degassing with a Smart VacPrep.
l
Backfill sample tube.
Indicate if the sample tube should be backfilled
automatically or wait for operator response.
l
Evacuation Rate.
Rate used for evacuation.
l
Unrestricted evac. from.
Pressure at which the unrestricted evac-
uation is to begin.
l
Vacuum level.
Pressure for unrestricted evacuation.
l
Evacuation time.
Length of time for preliminary evacuation before
proceeding with the
Heating Phase
temperature schedule. The timer
starts when the vacuum level is reached.
l
Temperature ramp rate.
Rate at which the temperature is to change
when advancing to the target pressure.
l
Target temperature.
Targeted pressure for evacuation.
l
Hold pressure.
Pressure at which heating will stop and hold the
sample temperature approximately constant until the pressure falls
below the
Hold
pressure. This prevents damage to the sample struc-
ture due to 'steaming' and /or elutriation due to excessive escaping gas
velocity.
Degas Conditions Fields and Buttons Table (continued)
S
TART
S
MART
V
AC
P
REP
D
EGAS
Smart VacPrep > Unit [n] > Start Degas
This option allows the degassing of up to six samples simultaneously. A sample can be added to any idle
port and a degas operation started. When adding a sample, the degas operation in progress will be
suspended until the sample reaches the target pressure, then degassing on all ports will resume. If other
samples are still in the initial evacuation phase, the new samples will wait until the fast evacuation is
started. Samples can be removed from any of the six ports without disturbing the degas operations
already in process. Starting several samples as a batch allows them to perform the initial evacuation at
the same time.
Start Smart VacPrep Degas
Smart VacPrep Operator Manual
3 - 5
Summary of Contents for Gemini VII 2390a
Page 1: ...Gemini VII Operator s Manual V3 02 239 42828 01 Jan 2014...
Page 4: ......
Page 12: ...Table of Contents Gemini VII viii 239 42828 01 Nov 2013...
Page 36: ...Menu Structure Gemini VII 2 14 239 42828 01 Dec 2012...
Page 192: ...Service Test Gemini VII 6 24 239 42828 01 Dec 2012...
Page 217: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 25 Isotherm Linear Plot...
Page 218: ...Report Examples Gemini VII 7 26 239 42828 01 Dec 2012 BET Surface Area Report...
Page 219: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 27 BET Surface Area Plot...
Page 220: ...Report Examples Gemini VII 7 28 239 42828 01 Dec 2012 t Plot...
Page 221: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 29 BJH Adsorption Cumulative Pore Volume...
Page 222: ...Report Examples Gemini VII 7 30 239 42828 01 Dec 2012 BJH Adsorption dV dlog w Pore Volume...
Page 264: ......
Page 266: ......
Page 294: ...Appendix B Gemini VII B 28 239 42828 01 Nov 2013...
Page 364: ...Appendix F Gemini VII F 18 239 42828 01 Dec 2012...
Page 372: ...Gemini VII Smart VacPrep Operator Manual Dec 2013 G 1 G Smart VacPrep Operator Manual...
Page 380: ...Contact Us vi Smart VacPrep Operator Manual...
Page 390: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Page 424: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...