3 Operate the Smart VacPrep
10. Install the safety shield.
11. Press the
Select
button for the port to be degassed. A blue LED is lit.
12. Press the
Start
button on the Smart VacPrep panel to start the degas process for all ports that
have a blue LED lit.
13. When degassing is complete and the sample has cooled, the sample can be transferred to an ana-
lysis port.
L
OAD
Q
UICK
S
TART
D
EGAS
C
ONDITIONS INTO A
S
AMPLE
F
ILE
QuickStart Degas Conditions can be copied into a sample file. Reference the Degas Conditions section
of the analyzer Operator Manual.
Field or Button
Description
Close
Closes the active window.
Copy QuickStart Degas
Conditions from the
Smart VacPrep Unit
Use to copy the degas conditions settings from the selected Smart
VacPrep unit and port.
Degas Conditions
Use to browse for a .DEG file that contains degas condition parameters
to be used in the analysis.
Heating Phase
This option is applicable when degassing with either a Smart VacPrep or
a SmartPrep.
Enter up to five stages of degas conditions.
l
Temperature.
Degas temperature.
l
Temperature Ramp Rate.
Rate at which the temperature is to
change.
l
Time.
Amount of time to heat the sample.
Use to modify the table contents.
l
Insert.
Inserts one row above the selected row.
l
Delete.
Deletes the selected row.
l
Clear.
Clears all table entries and displays only one default value.
l
Append.
Inserts one row at the end of the table.
Degas Conditions Fields and Buttons Table
3 - 4
Smart VacPrep Operator Manual
Summary of Contents for Gemini VII 2390a
Page 1: ...Gemini VII Operator s Manual V3 02 239 42828 01 Jan 2014...
Page 4: ......
Page 12: ...Table of Contents Gemini VII viii 239 42828 01 Nov 2013...
Page 36: ...Menu Structure Gemini VII 2 14 239 42828 01 Dec 2012...
Page 192: ...Service Test Gemini VII 6 24 239 42828 01 Dec 2012...
Page 217: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 25 Isotherm Linear Plot...
Page 218: ...Report Examples Gemini VII 7 26 239 42828 01 Dec 2012 BET Surface Area Report...
Page 219: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 27 BET Surface Area Plot...
Page 220: ...Report Examples Gemini VII 7 28 239 42828 01 Dec 2012 t Plot...
Page 221: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 29 BJH Adsorption Cumulative Pore Volume...
Page 222: ...Report Examples Gemini VII 7 30 239 42828 01 Dec 2012 BJH Adsorption dV dlog w Pore Volume...
Page 264: ......
Page 266: ......
Page 294: ...Appendix B Gemini VII B 28 239 42828 01 Nov 2013...
Page 364: ...Appendix F Gemini VII F 18 239 42828 01 Dec 2012...
Page 372: ...Gemini VII Smart VacPrep Operator Manual Dec 2013 G 1 G Smart VacPrep Operator Manual...
Page 380: ...Contact Us vi Smart VacPrep Operator Manual...
Page 390: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Page 424: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...