Calibrating the System
Gemini VII
9-30
239-42828-01 - Dec 2012
If the BET Surface Areas match, click
Close
.
Calibrating the System
A calibration file was created specifically for your analyzer and included with your accessories. Refer
to
Reinstalling Calibration Files for an Analyzer
. It is not necessary to recalibrate the
system unless you suspect it is out of calibration. Certain calibrations are not allowed unless performed
under the direction of a Micromeritics service representative. Those calibrations are greyed out on the
Calibration menu.
To review calibration details of the analyzer, go to
Unit [n] > Unit Configuration.
The following calibrations can be performed without the assistance of a service representative:
• Zero pressure
• Match transducers
• Servo valve
Zero Pressure
Use this option to evacuate the system and zero the transducers.
1.
Install a blank sample tube on each applicable port.
2.
Go to
Unit [n] > Calibration > Zero Pressure.
3.
Ensure that all transducers are selected, then click
Start
. The window closes when the operation is
complete.
The measured free space is too high. This
indicates the helium is not pure enough.
Use helium that is 99.999% pure, then try again.
Cause
Action (continued)
Summary of Contents for Gemini VII 2390a
Page 1: ...Gemini VII Operator s Manual V3 02 239 42828 01 Jan 2014...
Page 4: ......
Page 12: ...Table of Contents Gemini VII viii 239 42828 01 Nov 2013...
Page 36: ...Menu Structure Gemini VII 2 14 239 42828 01 Dec 2012...
Page 192: ...Service Test Gemini VII 6 24 239 42828 01 Dec 2012...
Page 217: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 25 Isotherm Linear Plot...
Page 218: ...Report Examples Gemini VII 7 26 239 42828 01 Dec 2012 BET Surface Area Report...
Page 219: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 27 BET Surface Area Plot...
Page 220: ...Report Examples Gemini VII 7 28 239 42828 01 Dec 2012 t Plot...
Page 221: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 29 BJH Adsorption Cumulative Pore Volume...
Page 222: ...Report Examples Gemini VII 7 30 239 42828 01 Dec 2012 BJH Adsorption dV dlog w Pore Volume...
Page 264: ......
Page 266: ......
Page 294: ...Appendix B Gemini VII B 28 239 42828 01 Nov 2013...
Page 364: ...Appendix F Gemini VII F 18 239 42828 01 Dec 2012...
Page 372: ...Gemini VII Smart VacPrep Operator Manual Dec 2013 G 1 G Smart VacPrep Operator Manual...
Page 380: ...Contact Us vi Smart VacPrep Operator Manual...
Page 390: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Page 424: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...