background image

Summary of Contents for NEPTUNE GB

Page 1: ......

Page 2: ...receive the fixture and check if it was damaged during the transportation And please check whether the following items are included inside the box Fixture One Power Cord One Bracket Set One User Manu...

Page 3: ...protected from any tremor or agitation during transport Do not expose the fixture in any excessive heat moisture or any environment with too much dust when installing Do not lay any power cables on th...

Page 4: ...reached by unauthorized personnel Before mounting the fixture to any surface make sure that the installation area can hold a minimum point load of 10 times the device s weight Fixture installation mu...

Page 5: ...n XLR cable to the female 3 pin XLR output of your controller and the other side to the male 3 pin XLR input of the MICROH NEPTUNE GB To connect the units to DMX you must daisy chain the fixtures toge...

Page 6: ...vement Channel 6 Vertical Movement 1 160 Manual 161 190 Down to Up Movement Slow to Fast 191 220 Up to Down Movement Slow to Fast 221 255 Up and Down In phase Movement Channel 7 Zoom Pattern Size 0 25...

Page 7: ...DPSS Green 532nm Blue450nm SCANNER 1 8 High Precision Stepper Motor SCANNING ANGLE 30 COOLING SYSTEM Fan MAX RUN TIME Approximately 4 Hours WARM UP TIME 15 Minutes WORKING TEMPERATURE 10 35 C SCANNER...

Page 8: ...accumulation of dust dirt etc 2 Clean the fan each week 3 A detailed electrical check by approved technician every three months is advised Ensure the circuit contacts are in good condition and prevent...

Page 9: ......

Reviews: