M
‑
I SWACO
MONGOOSE PRO Shale Shaker
15
Field Installation and Operation Manual 9092F02001AENG (D)
15
Figure 12. Piping Installation Guide Stenciling (Arrowed)
10.1.3
Connecting Rig Power
WARNING
ELECTRICAL CONNECTIONS MUST BE COMPLETED BY A CERTIFIED ELECTRICIAN.
UNTRAINED PERSONNEL ATTEMPTING TO COMPLETE THE FOLLOWING STEPS
ARE AT RISK FOR SEVERE ELECTRICAL SHOCK, WHICH MAY RESULT IN INJURY
OR DEATH.
Powering a MONGOOSE PRO Shale Shaker requires a client-supplied power source to be connected to the
control panel.
1.
Confirm motor connections to the control panel comply with the Cable Block Diagram in paragraph 21.1.1.
2.
Connect the control panel to the equipment junction box.
3.
Connect to the rig power.
10.1.3.1
Connecting UL Panel
Depending on the configuration, the MONGOOSE PRO is UL or ATEX/IECEx rated. The wiring and control
panels for the UL and ATEX/IECEx rated assemblies are slightly different from one another. Refer to the
appropriate control panel diagram for the unit.
TIP
IT IS NOT NECESSARY TO SHUTDOWN THE EQUIPMENT WHEN SWITCHING
BETWEEN THE BALANCED ELLIPTICAL AND PROGRESSIVE ELLIPTICAL MOTIONS.
The UL rated panel (Refer to Figure 13) is a simple three-button layout.
NOTE
REFER TO WIRING SCHEMATICS IN PARAGRAPH 21.1.
1.
Open control panel door.
a.
Inlet port is located on side of control box (Refer to Figure 14).