![MHM iQ-Oval CDS Operating Instructions Manual Download Page 18](http://html1.mh-extra.com/html/mhm/iq-oval-cds/iq-oval-cds_operating-instructions-manual_1783429018.webp)
Operating instructions iQ-Oval CDS V1-4.docx
page 18 of 66
6.
Commissioning the iQ-Oval CDS
After the initial start-up of the machine, commissioning is to be completed in the
presence of the authorized technician along with any persons authorized on the part
of the customer. During this initial start-up and commissioning, all tasks carried out by
the MHM service engineer or the technicians of an authorized dealer are recorded.
This installation/job sheet must be clearly signed by both parties, stating the date and
location of the iQ-Oval CDS and will be legally binding hereon after.
Initial start-up of the iQ-Oval CDS should only be carried out by an
authorised MHM service engineer or by an approved technician from
an official MHM dealer/agent.
Any defects or complaints must be brought to the attention of the
authorized technician, documented in writing and recorded
immediately on
the service technician’s installation/job sheet.
Before starting the machine, mains connection and compressed-air
supply must be checked and, if necessary, established according to
the instructions.