PRE-LIFT CHECKS
Before lifting there are several checks which should be done:
•
Must ensure that there is suitable clearance between the equipment used to connect to
the shackles and the end attachment.
•
Must ensure that the drop link is free to rotate before use.
•
Must ensure that the slings are not twisted or tangled.
•
Keep the loaded spreader beam clear of obstacles – any contact could cause unsafe
release of load or beam failure.
•
Ensure the smaller shackles are attached to the bottom of the drop link.
•
Ensure that the top sling lengths are suitable, and the beam does not tilt.
•
Ensure that the centre of gravity of the object being lifted is positioned underneath the
•
Each component needs to be checked prior to each lift.
•
Carry out a visual alignment check for each assembly to ensure straightness without
•
Prior to first use of a new assembly, carry out a trial lift just above ground level to ensure
that straightness is maintained under its own self-weight.
master link.
kinks or bows along the length.
500MM
740MM AT 30° STV
Figure 5 - Drop Link Clearance
425MM
USER
GUIDE
SEC
TION
4
9
S8
0 SPREADER
BEAM