background image

T

H

E

U

N

I

N

T

E

R

R

U

P

T

I

B

L

E

P

O

W

E R

P R

O V

I D E

R

Installation and user
manual

CleanWave

12÷280 kVA

English

Summary of Contents for 12280 kVA

Page 1: ...T H E U N I N T E R R U P T I B L E P O W E R P R O V I D E R Installation and user manual CleanWave 12 280 kVA English...

Page 2: ...ical specifications 6 3 SAFETY 7 3 1 Integration in housing 7 3 2 Cooling 7 3 3 Electrical connections 7 3 4 Access to the filter 7 4 ELECTRICAL ENGINEERING 8 4 1 Electrical schematic 8 4 2 Electrical...

Page 3: ...2 PRESENTATION 2 1 GENERAL PRESENTATION The CleanWave filter exists in 2 versions IP00 Basic version to be integrated by the customer IP21 Turn key version integrated in its housing The IP00 version...

Page 4: ...ilter appears as follows 10 11 14 12 17 15 16 13 Fig 3 10 Lifting rings 11 Upstream current display 12 Downstream current display 13 Removable top panel 14 Side panel for cabling 15 Ventilation grid 1...

Page 5: ...12 12 16 29 176 2 5 6 2 5 6 CleanWave 18 18 24 43 219 4 10 4 10 CleanWave 30 30 40 72 359 10 25 10 25 CleanWave 40 40 56 101 452 16 35 16 35 CleanWave 55 55 80 144 538 25 2x 25 16 2x 25 CleanWave 90...

Page 6: ...ween phases 400V 15 10 Reduction ratio I I Neutral upstream Neutral downstream 1 10 Ratio I I Neutral Phase 1 8 Inrush current Inominal Overload capacity 10 1 hour 25 10 minutes 50 2 minutes Insulatio...

Page 7: ...tandard conditions are given in table 4 In the case of the IP21 version the integrator must ensure that the ventilation grids on the front and rear sides of the filter are not obstructed A minimum dis...

Page 8: ...trapolar circuit breaker 3 phases neutral with neutral over current detection If such a protection is not possible e g when the neutral and earth connectors are common PEN a tripolar breaker will be u...

Page 9: ...ne with no voltage by a qualified electrician N L1 L2 L3 N L1 CleanWave Fig 7 Upstream terminals Downstream terminals To mains L2 L3 To distorting load D1 Breaker Earth PE 4 1 2 3 5 6 7 8 The power co...

Page 10: ...ntacts are available Terminals Connection A1 A2 Normally open contact Warning 165 C D1 D2 Normally closed contact Alarm 190 C Table 10 These contacts are connected on two small terminal boards Fig 2 9...

Page 11: ...owing Switch off the power of the CleanWave filter Open the housing in order to access the filter In the case of the IP21 CleanWave filter Unscrew and remove the lower part of the front panel see fig...

Page 12: ...rder to avoid overheating of the filter Check that the phase and neutral currents respect the limits given in table 4 Check that the ventilation grids front and rear are not obstructed Check that the...

Page 13: ...MGE UPS SYSTEMS T H E U N I N T E R R U P T I B L E P O W E R P R O V I D E R 140 Avenue Jean Kuntzmann ZIRST Montbonnot St Martin 38334 Saint Ismier Cedex France www mgeups com...

Reviews: