1-800-325-9103
PB-MIXER-TR-MECH
- 39 -
www.meyermfg.com
8.2 ADJUSTMENTS
8.2.1 Auger Scraper Bar
Check the auger scraper monthly for proper clearance with the
side panel. Clearance should not exceed 1/2”. If gap exceeds 1/2”,
the scraper should be adjusted to 1/8” clearance.
8.2.2 Auger Timing
Auger timing is critical. Whenever disconnecting the PTO
connecting the two planetaries, it is critical that the front leading
edge be 225° from the rear leading edge when the rear leading
edge is pointing to the front auger.
8.2.3 PTO Cutout Clutch Connection
The cutout clutch end of the PTO driveline must always be
attached to the implement. The PTO driveline is equipped with a 1-
3/4 x 20 spline on the implement half for attaching to the mixer.
Remove the M16-hexagon bolt from the splined hub and slide the
PTO onto the implement splined input shaft. Install the hexagon
bolt (Item 1) through the hub being sure the bolt is falling into the
groove on the splined shaft. Torque tight using a metric size M16 6-
point socket and torque down to 75 ft. lbs. A M16 6-POINT
METRIC SOCKET MUST BE USED AS ROUNDING OF
HEXAGON BOLT AND INACCURACY OF TORQUE SETTINGS
COULD OCCUR.
If removal of the M-16 hexagon bolt is necessary, use the same
M-16 6-point socket and loosen bolt 1/2 turn. Insert a 1/4” drift
punch in the hole on the opposite side of the hexagon bolt and tap to loosen the seated portion of the bolt from the
splined hub. Loosen in 1/4 turn increments and tapping to loosen. After bolt seat has been released, remove the bolt. If
bolt is not unseated, damage to the hexagon bolt will occur.
Shutoff and lockout power before performing machine service,
adjusting, maintaining, or clearing an obstruction from this machine.
Refer to section 5.3 SHUTOFF & LOCKOUT POWER.
If work must be done inside the mixer put a protective cover over the
auger knives to avoid injury. The hopper and flighting may be
slippery. Use caution when stepping on or standing inside the mixer.
1
Summary of Contents for F585 2018
Page 10: ...Meyer Manufacturing Corporation 10 PB MIXER TR MECH ...
Page 12: ...Meyer Manufacturing Corporation 12 PB MIXER TR MECH ...
Page 44: ...Meyer Manufacturing Corporation 44 PB MIXER TR MECH ...
Page 57: ...1 800 325 9103 PB MIXER TR MECH 57 www meyermfg com ...
Page 58: ...Meyer Manufacturing Corporation 58 PB MIXER TR MECH DOOR FM 100 8 3 1 2 6 11 9 5 4 7 10 ...
Page 62: ...Meyer Manufacturing Corporation 62 PB MIXER TR MECH AUGER PB 19_004 6 1 2 7 8 3 5 9 4 10 ...
Page 90: ...Meyer Manufacturing Corporation 90 PB MIXER TR MECH ...