Wall formwork
Mammut XT
Pouring heights of 4.25 m or
higher require the number of
assembly locks and alignment
rails shown in Table 45.3.
The alignment rails must be
attached to the panels with two
flange screws 18. Always start
attaching the alignment rails
at the bottom multi-function
profile, i.e. the first alignment
rail must be attached to the
bottom multifunction profile of
the bottom outside corner. Note
that the alignment rails must
cover the next panel joint and
be bolted at the corners (Fig-
ures 45.1 and 45.2).
Height-extended outside corner
Pouring
height (cm)
Number of alignment rails (from bottom to top) at
wall thickness (cm)
Number of M
assembly locks
0–25
26–50
51–75
76–100
101–125
425
—
—
—
1
1
10
475
—
—
—
1
1
10
500
—
—
—
1
1
11
550
—
—
—
2
2
12
600
—
—
1
2
2
13
650
1
1
1
2
2
14
700
1
1
1
2
2
15
750
1
1
1
2
2
16
800
2
2
2
3
3
17
850
2
2
2
3
3
18
900
2
2
2
3
3
19
950
3
3
3
4
4
20
Flange screw 18
Head bolt M18x100
90° corner – Height-extended outside corner
Fig. 45.1
Fig. 45.2
Table 45.3
Alignment rails
Description
Ref. No.
M alignment rail 180 ............
29-400-92
M alignment rail 250 ............
29-402-50
Flange screw 18 ....................
29-401-10
XT-45