Electrical Safety and Quality ApplicationTrainer - Introduction
MI 3399
13
Remove the last part of the transport case.
For any further transport, this transport
case would be needed. Please keep safe
all the parts of transport case in dry
environment condition.
Figure 3-8: Unpacking the Application trainer (8).
Prepare the bottom part. Find two wires
below the cover. Connect the blue and
black banana to the blue and black plugs on
the bottom side of the MI3399. Fit the
corner’s bottom part to the corner’s wall.
Use the long screws from the transport
case and fit the walls to the bottom part.
Figure 3-9: Unpacking the Application trainer (9).
Find the key of the corner’s draw connected
to the lightning leg.
Figure 3-10: Unpacking the Application trainer (10).
Summary of Contents for MI 3399
Page 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Page 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Page 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Page 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Page 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Page 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Page 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...