MULTIPLE HEATER VENTING (CONNECTIONS INTO A COMMON VENT OR MANIFOLD)
Requirements for venting of multiple heaters are the same as described for SINGLE HEATER VENTING except as
follows:
1.
The common vent size and total vent height is normally determined by the number of heaters per common
vent, length of horizontal connector runs, and connector fall. Connector lengths should be as short as
possible and have a minimum 1/4 inch per foot rise. Without regard to connector fall and total vent height
due to many possible venting configurations, the following should be observed:
Common vent pipe & vent connector diameter should be no less than that shown in the following Vent
Sizing Table.
A Y-connector must be used to the common vent.
2.
Material for connectors and Y-connectors should be constructed of galvanized sheet metal or other approved
noncombustible corrosion resistant material as allowed by state or local codes. All common vent pipe
should be insulated flue pipe or double wall, Type B vent.
3.
Avoid unnecessary bends. Limit to two (2) 90º elbows.
4.
The entire length of vent connector shall be readily accessible for inspection, cleaning and replacement.
5.
Groups of heaters with a common vent must be controlled by a common thermostat.
If any heater connected to a common vent system for multiple
heaters is found inoperative, the heater should be disconnected from
the vent system and its entrance into the vent system capped.
Summary of Contents for 44488010
Page 15: ...Form 43343350 14 Dec 2017 7 1 TYPICAL ASSEMBLY LAYOUT STRAIGHT SERIES SHOWN ...
Page 16: ...Form 43343350 Dec 2017 15 8 0 DIMENSIONS STRAIGHT SERIES Typical Dimensions Up to 60 Ft Shown ...
Page 17: ...Form 43343350 16 Dec 2017 8 1 DIMENSIONS U SERIES Typical Dimensions Up to 50 Ft Shown ...
Page 18: ...Form 43343350 Dec 2017 17 8 2 HEATER ASSEMBLY JOINING OF TUBE SECTIONS ...
Page 19: ...Form 43343350 18 Dec 2017 ...
Page 52: ...Form 43343350 Dec 2017 51 20 0 CONTROL COMPONENT LOCATION ...
Page 54: ...Form 43343350 Dec 2017 53 22 0 TROUBLESHOOTING GUIDE SINGLE STAGE N1 L1 ...
Page 55: ...Form 43343350 54 Dec 2017 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED ...
Page 56: ...Form 43343350 Dec 2017 55 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED ...
Page 57: ...Form 43343350 56 Dec 2017 22 1 TROUBLESHOOTING GUIDE TWO STAGE N2 L2 ...
Page 58: ...Form 43343350 Dec 2017 57 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED ...
Page 59: ...Form 43343350 58 Dec 2017 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED ...
Page 66: ...Form 43343350 Dec 2017 65 ...