OUTBOARD INSTALLATION
110
eng
2. Thread the lifting eye into the flywheel hub for a minimum of
five turns.
a -
Lifting eye
3. Connect a hoist to the lifting eye.
4. Lift the outboard and place it on the boat transom.
Lifting Eye
91‑90455‑‑1
2756
Threads into the flywheel to
remove the powerhead
assembly from the driveshaft
housing, or to lift entire engine
for removal/installation.
Steering Cable ‑ Starboard Side Routed Cable
1. Lubricate O‑ring seal and entire cable end.
3724
95
Tube
Ref No.
Description
Where Used
Part No.
95
2-4-C with
PTFE
O-ring seal and entire cable
end
92-802859A 1
a
28495
Summary of Contents for 200 Optimax
Page 6: ...vi eng ...
Page 12: ...xii eng ...
Page 114: ...TROUBLESHOOTING 102 eng Defective rectifier alternator or voltage regulator ...