General Technical Guide VEGA Lightbars Class 2 Siren / SPA Handy with Roof Connector
GT-0775-RAM Ind B
24/10/2018
Head Office
: Zone d’Activités « Les Gailletrous » - rue Louis Pasteur- 41260 LA CHAUSSEE SAINT VICTOR
Tel : 02 54 57 52 52
– Fax 02 54 56 80 00
SAS with capital
102. 400 € - APE (NAF) 2790 Z – SIRET 310 999 891 00040
Page 7
31946-01
6.6.
ROOF DRILLING DIAGRAM
2 fixing points
A. 2 base fixing screws
B. 18-point
Harting base
C. Roof connector gasket
D.
Vehicle’s roof
E. Roof drilling (refer to the template)
F. 2 inox washers
G. 2 star washers
H. 2 locking nuts
6.7.
MOUNTING EVALUATION
Temporarily place the lightbar on the roof to assess its position and inclination on the vehicle. This pre-
installation operation should also enable to evaluate harness routing inside the vehicle.
IMPERATIVELY CLEAN THE ROOF BEFORE INSTALLATION TO PRESERVE IT FROM DEGRADATION DURING
INSTALLATION AND TO FACILITATE POSITIONING OF THE LIGHTBAR.