1.

 

Unpack equipment and accessories at the FAS location to ensure the equipment arrived 
in good condition and all pieces are included.  The FAS should plug in units to ensure 
they operate correctly. Coordinate with the store to ensure the staff will be present for 
training on the night of install and the “morning” person is present so they can train the 
next morning. 

2.

 

Ensure the proper outlets / breakers for the cabinets are installed in the store where 
the cabinets are going to be located.   

Receptacles will be #’s 5-15R, 5-20R, & L5-30R to 

match the plugs listed below.  

This may have to be done with a site visit. 

Domestic Model  Voltage, Cycle, Phase  Watts 

Amps 

Plug 

MHC22SNT1T 120V, 

60H, 

1Ph 660 

5.5 

5-15P 

MHC24SNT2T 120V, 

60H, 

1Ph 

1320 

11.0 

5-15P 

MHC52SNT1T 120V, 

60H, 

1Ph 

1920 

16.0 

5-20P 

MHC54SNT1T 120V, 

60H, 

1Ph 

2880 

24.0 

L5-30P 

 

 

      

      

 

 

 

3.

 

Read the Installation and Operation manual to understand proper installation, set up, 
operation, cleaning, and preventive maintenance. 

4.

 

Wash all tray seal, trays, RFID collars, and trivets / false bottoms.  This is done at the 
store with the staffs help.  See photos below and on the following page. 

 

      

        

 

Subject: FAS Installation Instructions (Scope 
of Work for RISE) 
Models affected: MercoMax (MHC) Visual 
Holding Cabinets  

Instruction 
Sheet 

 

 

MERCO 

 8700 LINE AVENUE, SHREVEPORT, LA 71106 

  

800-379-7278  

WWW.MERCOPRODUCTS.COM  

 

 

L5

30P

 

Summary of Contents for MHC22SNT1T

Page 1: ...cles will be s 5 15R 5 20R L5 30R to match the plugs listed below This may have to be done with a site visit Domestic Model Voltage Cycle Phase Watts Amps Plug MHC22SNT1T 120V 60H 1Ph 660 5 5 5 15P MH...

Page 2: ...ped to another location as an addition to the installation pricing 6 Plug in new Merco Cabinets and pre heat approx 15 minutes The screen will display a brown segment slowly covering the yellow as it...

Page 3: ...Instructions 9 Press the USB Icon from the home screen 10 Press the lock icon 11 Enter code 159357 and press the GREEN check button 12 Press and hold the refresh button for 3 seconds 13 The menus are...

Page 4: ...e home screen see Figure 10 18 On the next screen press the row of dots at the bottom of the screen see Figure 11 19 The tools options menu is displayed Press the System Information button see Figure...

Page 5: ...for edit have a shaded box see Figure 17 24 Press the shaded box and use the pop up keyboard to enter the data see Figure 18 25 Repeat for each field of data 26 When finished entering the data press t...

Page 6: ...the others in gray There is no change is countdown or timer behavior When the first item is canceled or reset the next one in order will turn green Use Highlighted Tray First Lid Requirements No line...

Page 7: ...mitter Router The RFID identifier is built into the RFID collars above The collars are placed on a holding tray and initialize the unique holding time and temperature for that product in the first hol...

Reviews: