background image

P 13

Please retain product label and instructions for future reference

Roof

Closure Trim

Internal

34

34

34

34

34

34

*Measure and cut the

closure trims to

fit the internal space.

Pre drill 

hole

30mm 

screw

*

trim to fit

Step 15

Parts needed - No. 34 QTY 7 

   

 

Inside the building place the closure 

trim (

No. 34

) against the boarding 

and align with the roof as shown in 

the illustration. 

Once in position fix each trim 

into place by pre drilling a pilot hole 

and using 6x30mm screws per trim, 

equally spacing them along the face 

of the board.

42x30mm Screws

30mm 

screw

Pre drill 

hole

*

Cut to fit

Step 16

Parts needed - No. 34 QTY 7

Once the floor has been laid arrange the

closure trim (

No. 34

) around the outside 

edge of floor (

internally

), measure and cut 

down accordingly to best match the 

internal space.

Secure each trim section into place using 

6x30mm spaced equally along the board 

as shown in the illustration.

*Do NOT fix the closure trim to the floor

sheets/boards.

42x30mm Screws

 

Summary of Contents for 0628LOG131-V4

Page 1: ...ilding is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to...

Page 2: ...B28RT66 A 4000 Starter Board 28x66x2220mm LB28RT66 A 2220 Starter Board 28x66x2000mm LB28RT66 A 2000 Log Board 28x120x2111mm QTY 6 LB28 A 2111 Log Board 28x120x2000mm QTY 6 LB28 A 2000 Log Board 28x12...

Page 3: ...for future reference Veranda Post 70x70x2001mm F7070 2001 Notched Fascia 16x120x1601mm QTY 4 S16120 1601 Angled Fascia 16x120x4036mm QTY 2 S16120 4036 Eaves Frame 27x44x4000mm QTY 2 F2744 4000 Roof B...

Page 4: ...ds No 6 7 8 9 11 22 on to the assembled base frame along the longest sides Ensure the notches at either end of each board are flush and level with the ends of the frame Fix each of the starter boards...

Page 5: ...ards at the front of the building either side of the door and window opening s can be placed either side depending on your needs 9 22 11 19 13 10 19 Step 4 Once you have laid 6 log boards off of the s...

Page 6: ...boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame Please Note The short boards placed to create the opening s for the doors...

Page 7: ...Screws Step 7 See Pre Assembly Parts needed No 11 QTY 6 No 13 QTY 6 No 17 QTY 12 No 18 QTY 12 No 19 QTY 12 No 22 QTY 6 Following the same method outlined in Pre Assembly lay the remaining boards No s...

Page 8: ...12 22 onto the assembly as shown in the illustration Ensure that the boards are level and flush with each other as you lay each one Fix each board to the one below using 1x70mm screw per side Fix the...

Page 9: ...gger the screws to ensure not to collide 4x70mm Screws Pre drill hole 70mm screw 21 Step 15 See Pre Assembly Parts needed No 21 QTY 1 Keep adding the remaining boards onto the front and gables followi...

Page 10: ...the boards splitting using 4x70mm screws per purlin Please note The gable shown is for illustrative purposes and may differ in width from your choice in product Nevertheless despite any differences th...

Page 11: ...the apex The last board on each side will overhang Using a staight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down board s back onto th...

Page 12: ...d 1mm under the measurement This will allow the timber to expand and contract correctly Once all the floor boards are in position secure each board into position using 8x40mm screws Please Note Ensure...

Page 13: ...position fix each trim into place by pre drilling a pilot hole and using 6x30mm screws per trim equally spacing them along the face of the board 42x30mm Screws 30mm screw Pre drill hole Cut to fit Ste...

Page 14: ...mm 1 2 3 4 5 Step 26 Parts needed No 26 QTY 4 Align the fascia s No 26 with the roof and fix into place using 3x40mm screws per fascia making to screw through the fascia into the roof purlins and eave...

Page 15: ...internally Place 2x storm braces per side fixing into place using 2x 70mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure the storm braces are secured...

Reviews: