background image

P 1

0619LOG002-V4 (

2.6x3.3m

)

0619LOG002-V4: 2.6x3.3m T&G roof and floor

2mm Drill bit

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

BUILDING A BASE

When thinking about where the building and base are going to be constructed: 

Ensure that there will be access (60cm) to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions.  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for your specific product code

For ease of assembly use a 

rubber mallet to fit the log 

boards. Do 

NOT

 use a heavy 

hammer.

Ensure to measure and check before cutting 

boards.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

It is advisable to use a hand 

saw when cutting roof and 

floor boards.

To ensure log boards are even, use a spirit 

level to check each layer has been installed 

correctly.

Summary of Contents for 0619LOG002-V4

Page 1: ...g is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be c...

Page 2: ...m QTY 29 MB16 C 2364 Roof Board 121x16x1752mm QTY 48 MB16 C 1752 Storm Brace 27x44x2000mm QTY 8 F2744 2000 23 Log Board 120x19x3296mm LB19 AD 3296 2 1 Short Window Pack QTY 2 Double Door Pack Log Boar...

Page 3: ...curing ensure that the boards are fitted properly in their respective tongues and grooves P 3 Please retain product label and instructions for future reference Felt Tacks x200 70mm Screw x60 Nail Bag...

Page 4: ...70mm screw b Following the same method arrange the remaining framing No 13 inside the assembled frame Ensure there is an equal amount of space between each frame Secure each of the frames in place usi...

Page 5: ...boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame Doors can be hung once the boarding has enclosed the door frame by 12 13...

Page 6: ...el to the top of the window and door frames Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame 9 18 19 11 St...

Page 7: ...position fix to each purlin using 3x40mm screws Ensure the roof boards meet at the top of the apex and leave an over hang at the bottom Due to natural occurences of wood shrinkage expansion You maybe...

Page 8: ...gth removing the excess Please note Mark the final board 2mm under the measurement This will allow the timber to expand and contract correctly Once all the floor boards are in position secure each boa...

Page 9: ...15 Pre drill hole 30mm screw trim to fit Step 14 Parts needed No 15 QTY 8 Inside the building place the closure trim No 15 against the boarding and align with the roof as shown in the illustration On...

Page 10: ...oint possible on each side Storm braces will help your building expand and contract properly Important Ensure each bolt is tightened using a washer so as not to damage the log boards 16x60mm Bolt Sets...

Reviews: