background image

P 1

03TGCORSE0407-V1

CORNER SUMMERHOUSE SHED EXTENSION

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the 

correct application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and Drill 

with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

Summary of Contents for 03TGCORSE0407-V1

Page 1: ...timber can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessiv...

Page 2: ...itable base ready to erect your building MADE IN GREAT BRITAIN Door Panel AI 03CORSE0407 V1DP Back Panel AI 03CORSE0407 V1BP Side Panel AI 03CORSE0407 V1SSP Floor AI 03CORSE0407 V1F Roof AI 03CORSE040...

Page 3: ...ith 4x30mm screws per hinge making sure to screw into the framing on the rear of the Doors Once the T hinges are fixed into position lay the Door Panel No 1 flat on the ground Fix the door in position...

Page 4: ...le 50mm screw Pre drill hole 60mm screw 7 Step 7 Before placing the Roof No 5 on the building place the roof upside down and attach the 2 Roof Trim pieces No 13 flush to the end perpendicular to the r...

Page 5: ...nce 1 2 3 4 5 6 3 0 2 0 m m 4 0 2 0 m m 1 5 0 0 m m 1000m m 1000m m 1000m m Step 10 Cut six strips from roll of felt 2x4020mm 4 and 5 3x3020mm 2 3 and 6 and 1x1420mm in length Place felt on top of roo...

Page 6: ...p 12 Fix the Fascia Trims No 10 plus the remaining Fascia Trims from the 7x7 Corner Summerhouse into place using 3x40mm screws per Trim 21x40mm Screws Step 13 Fix two Door blocks No 16 to the back of...

Page 7: ...ply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back P 4 Please retain product label and instru...

Reviews: