background image

REGISTER FOR YOUR

ANTI-ROT

GUARANTEE TODAY

PLEASE SCAN HERE:

**Protim Aquatan T5 (621)**

Your building has been dip treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the 

correct application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Measure 

under the 

head

Measure 

overall

length

 Screws & Nails

 Bolts

To identify the 

fixings required 

for each step use a 

measuring tape.

03DTSHPN1006FGD2TW-V1

DIP TREATED SHIPLAP PENT 10FT X 6FT FULLY GLAZED DOUBLE 2 TALL WINDOW

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, 

annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing 

damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above 

the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

P 1

Please retain product label and instructions for future reference

             

General Instructions

Summary of Contents for 03DTSHPN1006FGD2TW-V1

Page 1: ...d avoid placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather condit...

Page 2: ...utt Hinge QTY 6 PI 07 0066 Door Handle QTY 2 PI 07 0081 Turn Button QTY 2 PI 07 0034 18 19 20 23 22 Press Lock PI 07 0162 Barrel Bolt QTY 2 PI 07 0114 Window Beading Block QTY 16 PI 07 0011 Fitted Win...

Page 3: ...utt hinges No 22 per door Ensure to predrill holes Fix to the door using 3x25mm screws 3x30mm screws to the Door Panel per hinge ensure the doors open freely Fix the door handles No 27 to the outside...

Page 4: ...1 Join the Left Panel No 4 together with Back Panel No 5 as shown in the illustration Please note that the back panel is is shorter than the side panels 5 4 Step 5 Parts needed No 3 QTY 1 No 5 QTY 1 C...

Page 5: ...nto the roof framing Ensure the eaves framing is flush to the edges of the roof framing before securing 12x50mm Screws 7 20 7 20 7 20 Step 9 Parts needed No 7 QTY 3 Place the Roof Panels No 7 onto the...

Page 6: ...to position making sure they are flush to the front of the building Using a pencil mark on the under roof panel where the roof panel framing is to use as a guide for fixing into place Fix in place mak...

Page 7: ...is approximately 50mm of overhang around the building Fix into place using 125x felt tacks at 100mm intervals 125x Felt tacks Felt Length 3110mm Felt tacks 1 2 3 24 Step 15 Parts needed No 16 QTY 2 No...

Page 8: ...ks No 23 to the window before fitting the window into the panel 48x30mm screws 11 c d 11 11 d c 23 Step 17 Parts needed No 12 QTY 1 No 13 QTY 1 Fix a rain guard above the double doors No 12 and one ra...

Page 9: ...g 2x30mm screws 4x30mm Screws These turn buttons help to keep your doors straight during high low levels of moisture content in the air Pre drill hole 25 25 28 25 30mm screw Step 20 Parts needed No 18...

Page 10: ...AFTER TREATMENT score around protective cover on glazing and carefully peel covering back SILIC O N E SEA LA N T Step 21 It is recommended that after the construction treatment and the removal of the...

Page 11: ...2 1 3 4...

Page 12: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Reviews: