Mercia Garden Products 02BRAM0806-V2 General Instructions Manual Download Page 1

02BRAM0806-V2

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

8x6 Multi Storey Bramble Playhouse

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, it is advisable to 

pilot drill all screw holes and ensure 

all screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(not supplied) including  a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather

conditions. For the duration of heavy or extended periods of rain, swelling of the

wood panels may occur. Warping of the wood may also occur during excessive

dry spells due to an interior moisture loss. Unfortunately, these processes cannot

be avoided but can be helped. It is suggested that the outdoor building is

sprayed with water during extended periods of warm sunshine and sheltered as

much as possible during rain or snow.

Our buildings are coated with a water based high quality colorant; this only 

helps to protect the product during transit and for up to 3 months against 

mould. To validate your guarantee and ensure longevity of the product, it is 

ESSENTIAL the building is treated with a wood preserver within the first three 

months of assembly and thereafter in accordance with the manufactures 

recommendations. Care must be taken to ensure the product is placed on a 

suitable base

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens products 

independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

Refer to the instructions pages for your specific product code

The images used throughout the instruction manual are generic and for 

illustration purposes only; they may vary dependant on your actual product.  It is 

strongly advised they are read and understood before attempting installation.

For family domestic use only

WARNING. Not suitable for children under 36 months

TO BE USED UNDER THE DIRECT SUPERVISION OF AN ADULT

Summary of Contents for 02BRAM0806-V2

Page 1: ...d thereafter in accordance with the manufactures recommendations Care must be taken to ensure the product is placed on a suitable base BUILDING A BASE When thinking about where the building and base i...

Page 2: ...dow Box Qty 2 Styrene Qty 10 13 Shutter Qty 2 20 14 15 16 17 18 19 Roof Eave 2200x28x28mm Qty 2 Short Fascia 1040x12x95mm Qty 2 Long Fascia 1960x12x95mm Qty 2 Ladder Step 390x27x90mm Qty 3 Ridge Bar 1...

Page 3: ...top middle and bottom of the door ensuring the screws will go into the framing Using 30mm black screws fix the hinges to the door and the door gable Ensure to pre drill the holes first 30mm Black Scre...

Page 4: ...unning parallel to the horizomtal framing on the large window side Fix in position using 7 x 70mm screws as in the diagram 7 Step 7 6 x 50mm screws DO NOT SECURE THE BUILDING TO THE FLOOR UNTIL AFTER...

Page 5: ...screws pre drill all screw holes to avoid the timber spliting 50mm screw 12x 50mm screws 16 15 14 Step 11 40mm screw 4 x 40mm screws Fix theLadder with 3x40mm screws as shown in illustration Fix the...

Page 6: ...3x30mm screws per strip and screw togther with 4x40mm screws 19 19 19 19 12x 30mm Screws 8 x 40mm Screws Step 15 Fix the Short Cover Trims to the right hand side of the building and the Long Cover tri...

Page 7: ...fix a beading block centrally to the framing above below to the left and right of the window with 30mm screws 11 31 12 30mm screw Step 19 WINDOW SILIC O N E SEA LA N T Fix window shutters with 4x 30m...

Reviews: