Operating Instructions - CPC3050
13
High-Speed Pressure Controller
CPC3050
3.2 Turning On
You can confirm that your CPC3050 is operational right now. Apply power to the power connector on the
rear of the instrument with the included power cord, remove any plastic plugs from the rear panel pres-
sure ports, and press the power switch to ON. The system will go through an initialization process, which
takes about 30 seconds, and then a display will appear similar to the screen shown below.
Power Switch
ON/OFF
!
Caution
Earth Ground! Any power adaptors or surge protection devices that negate the
protective earth ground should not be used. The power cord must be accessible
and contain a protective earth ground. Do not position the equipment so that it is
difficult to remove the power cord.
Ventilation! Do not block airflow to ventilating fans located on rear of instrument.
To see information about the configuration of your new CPC3050, touch the Next Page Button [
]
then the Information Application (App) icon [
] on the menu and a window will appear listing the
Mensor customer service contact, model number and the transducers that are installed. Press the
Previous Page Button [
] then the Home App [
] to return to the main screen.
Information Application
!
Caution