3.4
PLUMBING TECHNICAL REFERENCES
Gas Supply Requirements
NOTE: if Fireplace is to be operated with LP gas, see Chapter
3.14 Natural Gas to LPG Conversion
in this
manual before proceeding.
CORRECT GAS PRESSURE AND PROPER GAS SUPPLY LINE SIZING IS IMPERATIVE TO THE SUCCESSFUL PERFORMANCE OF YOUR
MENDOTA GAS FIREPLACE. BE SURE THE GAS SUPPLIER OR PLUMBER CAREFULLY CHECKS FOR CORRECT GAS PRESSURE AND
GAS LINE SIZING WHEN INSTALLING THE FIREPLACE.
IT IS CRITICAL TO CAREFULLY CHECK FOR GAS LEAKS WHEN HOOKING UP THE FIREPLACE. CHECK WITH SOAP AND WATER
SOLUTION OR COMBUSTIBLE GAS SNIFFER.
BE SURE TO INSTALL CSST FLEX GAS LINE WITH BRASS-TO-BRASS FITTINGS TO PREVENT GAS LEAKS AT CONNECTIONS.
GAS SUPPLY PIPING MUST INCLUDE A DRIP LEG TO ELIMINATE THE POSSIBILITY OF CONTAMINANTS ENTERING THE GAS
TRAIN. ADHERE STRICTLY TO LOCAL AND NATIONAL CODES.
Gas Supply Line Sizing
This Mendota Gas Fireplace comes equipped with a 1/2" N.P.T. Female inlet. Gas supply piping must enter the Fireplace cabinet
on the left side.
Use the table, below, to determine the proper gas line diameter that must be installed to run from the supply regulator to the
factory installed manual shutoff valve. Refer to the following table for proper gas pipe diameters.
PIPE LENGTH
[FEET]
SCHEDULE 40 PIPE
INSIDE DIA.
TUBING, TYPE L
OUTSIDE DIAMETER
NAT.
L.P.
NAT.
L.P.
0-10
1/2" [1.3 cm]
3/8" [1.0 cm]
1/2" [1.3 cm]
3 /8" [1.0 cm]
10-40
1/2" [1.3 cm]
1/2" [1.3 cm]
5/8" [1.6 cm]
1 /2" [1.3 cm]
40-100
1/2" [1.3 cm]
1/2" [1.3 cm]
3/4" [2.0 cm]
1 /2" [1.3 cm]
100-150
3/4" [2.0 cm]
1/2" [1.3 cm]
7/8" [2.3 cm]
5 /8" [1.6 cm]
150-200
3/4" [2.0 cm]
1/2" [1.3 cm]
7/8" [2.3 cm]
3 /4" [2.0 cm]
NOTE: Some areas allow copper tubing or galvanized pipe - check with local approval agencies and codes NEVER use plastic
pipe.
Figure 3-28 Gas Pressure Test Ports
Summary of Contents for AA-11-04109
Page 2: ...85 03 01154 FV36 D COR...
Page 16: ...85 03 01154 FV36 D COR Page 16 Figure 3 11 Figure 3 10...
Page 87: ...85 03 01154 FV36 D COR Page 87 Gas Train Assembly Parts Figure 5 5 Gas Train Assembly Parts...
Page 88: ...85 03 01154 FV36 D COR Page 88 Burner Figure 5 6 Burner...
Page 95: ......