Operating instructions
M-WRG-S/Z-S, M-WRG-S/Z-24,
M-WRG-S/Z-EIB, M-WRG-S/Z-KNX (-F, -FC) ventilation units
- 10 -
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
V E N T I L AT I O N & H E AT R E C O V E R Y
—
Build-up of icicles and ice patches at low temperatures
The heat recovery process in our ventilation units causes condensation. This condensa-
tion is dissipated to the outside via the exhaust air pipe. When external temperatures drop
below 0 °C this can cause a build-up of icicles at the outer wall terminals and ice patches
on the ground.
CAUTION
—
Starting and using the ventilation unit
► Do not start up the ventilation unit until it is fully installed.
► Always make sure that the cover is closed and locked in place before using the venti-
lation unit.
2.3
Notes on using the ventilation units
—
This unit may be used by children from 8 years old and by persons of restricted physical,
sensory or mental abilities or persons lacking experience and knowledge if they are super-
vised or have been instructed in how to use the unit safely and understand the associated
hazards. Do not allow children to play with the unit. Cleaning and user maintenance must
not be carried out by children unless they are supervised.
► Follow the regulations applicable in your country concerning the age from which
people may be permitted to operate the ventilation unit.
—
The ventilation unit must always be freely accessible for operation and maintenance.
► Make sure that the ventilation unit is not blocked, obstructed or covered when the
room is subsequently decorated and furnished, otherwise it cannot be used and it will
not be possible to replace the filter.
► Make sure that the supply and extract air openings are not blocked, obstructed or
covered when the room is subsequently decorated and furnished.
2.4
Intended use
—
The ventilation unit is intended for supplying air to and extracting air from living and recrea-
tion rooms (bedrooms, playrooms, living rooms, bathrooms, basement workshops, offices,
consulting rooms, etc.). The ventilation unit is installed in a perpendicular position in the
external wall. Any different or more extensive usage will be regarded as contrary to the
intended use.
—
The intended use also includes compliance with all the notes in the operating instructions.
—
The ventilation unit must not be operated without air filters.
—
The ventilation unit’s functions may be impaired or the unit may be damaged in rooms with
a lot of dust (e.g. model-making) or corrosive gas emissions (e.g. blueprint shop, cleaning).
—
For any use contrary to the intended use, Meltem Wärmerückgewinnung GmbH & Co. KG
shall accept no liability for any damage that may occur and offers no warranty that the
components will work perfectly and correctly.