Install 8 cage nuts (C) in the desired slots of the rack: 4 cage nuts in the non-extractable side and 4 cage nuts in the extractable
side. Note that while each rack U (unit) consists of three holes, the cage nut should be installed vertically with its ears
engaging the top and bottom holes only.
Installing the Cage Nuts
While your installation partner is supporting the system’s weight, perform steps 3, 4 and 5:
On the rear side of the cabinet, install the two blades (B) in the selected rack unit, using four M6 screws (C). Do not tighten the
screws yet.
Attaching the Rails to the Rack
Slide the two blades into the left and right rails, and adjust them to fit your rack's depth. Use four M6 screws (D) to fix the
blades into the rack. Do not tighten the screws yet.
Sliding the Blades in the Rails
Secure the system in the rack by tightening the 8 screws inserted in Step 3 and Step 4 with a torque of 4.5±0.5 Nm.
3.9 SN2100/SN2010 Side by Side Mounting Rail Kit
Kit OPN
Rack Size and Rack Depth Range
MTEF-KIT-D
Rack installation kit for SN2100/SN2010 series short depth 1U switches, allows installation of one or two
switches side-by-side into standard depth racks.
The following parts are included in the rail kit (see figure below):
1 metal frame for two systems (A)
2 system mounting blades with 8 screw holes - the kit contains enough rails to install 2 systems (B)
The installation process is demonstrated on an SN2100 system, but applies to the SN2010 series as well.
A designated rail kit for the SN2100/SN2010 systems can be purchased separately.
This section is relevant to short-depth systems that allow such a form of installation only.