FOCKE MELER GLUING SOLUTIONS
4-16
MELTER OPERATION
HMI
: S02001100 v1.0.106
TC
: S02200100 v1.0.084
IO
: S02102100 v1.0.106
IO
: S02101100 v1.0.106
75 rpm
50 rpm
50 rpm
49 rpm
53 rpm
PUMP 1
Real speed:
External reference 1
External permission 1
Switch 1
Real speed:
External reference 2
External permission 2
Switch 2
PUMP 2
HMI
: S02001100 v1.0.106
TC
: S02200100 v1.0.084
IO
: S02102100 v1.0.106
IO
: S02101100 v1.0.106
3,5 V
0
100
50
0
10
5
Volt
rpm
1
0,0
0
2
3,0
20
3
4,0
50
4
7,0
60
5
10
100
Pumping
Analog input
Pumping control menu
This menu allows you to configure the operating options for each of the pumps
installed.
• Start or stop pumping:
If external permission is deactivated, when you
press the ‘Pump 1/2’ key, pumping is activated or stopped manually.
When the key is green, the pump is in operation. When it is grey, the pump
is off.
• Pumping speed:
If the external speed reference is deactivated, when this
is pressed you can set the pump’s speed.
The minimum and maximum values that can be set are established in the
pump’s minimum and maximum speed alarms. See the point ‘Menu 5.
Pumping/Pumping alarms’.
At the bottom, the display shows the actual pumping speed at that
moment.
• External reference:
Activates or deactivates the external speed control of
the pump.
If it is activated, it takes you to a screen to set the pumping ramp speed.
See the point ‘Configuring ramp speed’.
• External permission:
Activates or deactivates the external pumping
permission.
When the contact is activated, the LED on the right is green. When it is
deactivated, it is red.
• Switch:
Activates or deactivates pump start-up from a switch connector
installed on the unit (optional).
When the contact is activated, the LED on the right is green. When it is
deactivated, it is red.
Summary of Contents for PS 20 NON STOP+
Page 1: ...GLUING SOLUTIONS MA 5195 ENG 010620 ADHESIVE MELTER PS20 NON STOP INSTRUCTIONS MANUAL ...
Page 8: ...FOCKE MELER GLUING SOLUTIONS TABLE OF CONTENTS This page is intentionally left blank ...
Page 68: ...FOCKE MELER GLUING SOLUTIONS 4 42 MELTER OPERATION This page is intentionally left blank ...
Page 80: ...FOCKE MELER GLUING SOLUTIONS 6 2 TECHNICAL CHARACTERISTICS Dimensions ...
Page 81: ...ELECTRICAL DRAWINGS 7 1 MA 5195 ENG PS20 NON STOP DRUM UNLOADER MANUAL 7 ELECTRICAL DRAWINGS ...
Page 82: ...FOCKE MELER GLUING SOLUTIONS 7 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Page 84: ...FOCKE MELER GLUING SOLUTIONS 8 2 PNEUMATIC DRAWING 16 17 19 18 10 11 12 13 14 15 ...
Page 86: ...FOCKE MELER GLUING SOLUTIONS 8 4 PNEUMATIC DRAWING This page is intentionally left blank ...
Page 88: ...FOCKE MELER GLUING SOLUTIONS 9 2 SPARE PARTS LIST This page is intentionally left blank ...