MA-5195-ENG
PS20 NON STOP+ DRUM UNLOADER MANUAL
MELTER OPERATION
4-1
4. MELTER OPERATION
In this section we will introduce the method for using the melter. Although its
operation is very simple, it should not be used by untrained personnel.
Warning
: Improper use may cause damage to the machine or injury and even
death to the person using it.
General information
There are three large groups of components with thermal control in a hot-
melt installation: the fusion unit, the transport hoses and the applicators. All
of these are controlled from the front panel of the melter equipment.
The first large group is the tank (A) an distributor (1 and 2) group and they
have separate programmable controls.
The second group is the hose group. They are identified on the front panel,
depending on the equipment model, by number, from number 1.1 to number
6.1 . Each one has its own set point value.
The third group is the applicators group. It is identified on the front panel,
depending on the equipment model, by number from number 1.2 to number
6.2 . Each one has its own set point value.
The hose and applicator numbers are automatically assigned to the hose/
applicator channel they are connected to on the rear part of the melter.
HMI
: S02001100 v1.0.106
TC
: S02200100 v1.0.084
IO
: S02102100 v1.0.106
IO
: S02101100 v1.0.106
160
154
B
15:35
°C
08:31
2
00
154
1
85
1 2
B
A
VP
160
A
185
170
1
154
154
2
100
100
3
---
---
4
5
42
42
6
Filling the tank
The machine is equipped with a detector in the pneumatic cylinder that warns
the user when the adhesive has all been melted.
Warning:
Before refilling the tank, make sure that the adhesive is the same
type as that already in the tank. Mixing different types of adhesives can cause
damage to the melter.
To fill the tank:
1 Make a concentric and circular cut of 210 mm
diameter in the block base. This part will be in
contact with the melter grill.
Summary of Contents for PS 20 NON STOP+
Page 1: ...GLUING SOLUTIONS MA 5195 ENG 010620 ADHESIVE MELTER PS20 NON STOP INSTRUCTIONS MANUAL ...
Page 8: ...FOCKE MELER GLUING SOLUTIONS TABLE OF CONTENTS This page is intentionally left blank ...
Page 68: ...FOCKE MELER GLUING SOLUTIONS 4 42 MELTER OPERATION This page is intentionally left blank ...
Page 80: ...FOCKE MELER GLUING SOLUTIONS 6 2 TECHNICAL CHARACTERISTICS Dimensions ...
Page 81: ...ELECTRICAL DRAWINGS 7 1 MA 5195 ENG PS20 NON STOP DRUM UNLOADER MANUAL 7 ELECTRICAL DRAWINGS ...
Page 82: ...FOCKE MELER GLUING SOLUTIONS 7 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Page 84: ...FOCKE MELER GLUING SOLUTIONS 8 2 PNEUMATIC DRAWING 16 17 19 18 10 11 12 13 14 15 ...
Page 86: ...FOCKE MELER GLUING SOLUTIONS 8 4 PNEUMATIC DRAWING This page is intentionally left blank ...
Page 88: ...FOCKE MELER GLUING SOLUTIONS 9 2 SPARE PARTS LIST This page is intentionally left blank ...