WasteStar installation operating instructions FC
9670512
Design and construction subject to change without prior notice!
Page
18
of
40
6.4
Operating conditions
It is assumed that the planning of the system, as well as installation, setting in op-
eration and maintenance works are executed by sufficiently instructed staff and
that these works are checked by responsible specialists. The details on the system
type plate must match those of the standard drawing and the locally available con-
nection conditions.
Conditions to be provided by the customer:
•
Frost free storage and installation area
•
Electrical connection in accordance with the installation drawing.
•
Anti-slip floor coverings must be provided in the system's work area.
6.4.1 Requirements for the installation area
Ensure that the storage and installation area is permanently frost free.
If the system is installed in an area where the surrounding temperatures are below
12°C, the water freezing inside may damage the internal water components (pump,
solenoid valve, etc.).
Summary of Contents for WasteStar FC
Page 40: ......