6.2.1 Installation and assembly
MEIKO created a standard drawing (see Technical data chapter) that features sys-
tem dimensions as well as connection and consumption values.
The system must be installed as per the information in the installation drawing. It
m u s t
be installed by a licensed and authorised technician.
We do not accept any liability for damage caused by unprofessionally implemented
connection work.
System installation steps:
The complete unit must be levelled in both directions using a water level.
Compensate for an uneven floor by adjusting the feet.
Table joints must be sealed with detergent-resistant sealing compound (e.g. sili-
cone).
6.3
Instructions for disposal of packing material
•
The four-sided wooden frame consists of untreated, raw pine / spruce. Special
country-specific import regulations may also stipulate the use of wood which
has been treated against pests.
•
The plastic sheeting (PE sheeting) can be recycled.
•
The cardboard packaging material used to protect the edges can also be re-
cycled.
•
The steel strap from the packaging can be recycled as steel scrap.
•
The plastic tensioning strap (PP) can be recycled.
6.4
Operating conditions
It is assumed that the planning of the system, as well as installation, setting in op-
eration and maintenance works are executed by sufficiently instructed staff and
that these works are checked by responsible specialists. The details on the system
type plate must match those of the standard drawing and the locally available con-
nection conditions.
Conditions to be provided by the customer:
Frost free storage and installation area
Electrical connection in accordance with standard drawing
(see
Technical
data
chapter).
Connect the fixed connection with main switch (design: main
switch, red/yellow with emergency off function). The main
switch must be easily accessible and in the direct vicinity of
operators.
Water connection with shower in work zone