
9018116
45 / 54
10.2 Maintenance table
Note
Maintenance work must
only
be carried out by MEIKO authorised staff!
Maintenance work
Visual check
Che
c
k
e
d
Cle
a
ne
d
Rec
on
di
tio
ne
d
Mainte-
nance re-
quirement
1.
Electrical installation
Re-tighten all screw connections (e.g. heating contactors, control fuse), check
plug/terminal connections
Annually
Carry out a visual check on all electrical equipment (e.g. switches, cables,
plugs, etc.)
Annually
Check tank and boiler heating
Annually
2.
Pumps
Check pumps for leaks and any visible damage
Annually
Check pumps for pump rotor noise and function
Annually
3.
Wash tank, wash and final rinse system
Functional and visual check of washing and rinse arms
Annually
Replace sealing rings on wash arms
Annually
Check air trap of the tank and clean if necessary
Annually
Check tank level control for leaks
Annually
Check sieves and filters
Annually
Check wash and rinse systems for leaks
Annually
Check water level in tank
Annually
4.
Casing
Check casing, tank and cladding for damage and function
Annually
5.
Fresh water installation
Check valves, clean dirt trap
Annually
Check that the boiler level control/air trap are not leaking
Annually
Check boiler, hoses, clamps and plastic parts do not leak
Annually
Check boiler drainage system does not leak
Annually
6.
Waste water installation
Replace flap on ventilation valve
Annually
Check operation of drain pump during drainage
Annually
Check that pumps, hoses are not leaking
Annually
Summary of Contents for TopClean M
Page 53: ...9018116 53 54 15 Notes...