Operating instructions, Integrated Reverse Osmosis, GiO-Module
Datei:BA_GiO-Modul_9661928_EN_2008-04.docx
9661928
6/14
W e reserv e the right to c hange ex ec ution and constr uction!
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
3.3
Installation
Caution: All lines must be installed properly!
Before the GiO module in the raw water line:
Install the connection set. (Caution: Keep a minimum distance of 100 mm to the underside of
the pedestal! Observe accessibility to the pressure reducer/adjusting screw.)
The assembly of the components of the pre-installed connection set must not be changed
With a standard diaphragm
The 10 µm filter insert (item no.: 9695683) must be replaced every 6 months!
7" (filter casing length = 178 mm)
With a chlorine resistant diaphragm
The 10 µm filter insert (item no.: 9702213) must be replaced every 3 months!
9 ¾" (filter casing length = 248 mm)
Wording of labels for changing the filter insert in the GiO pre-filtering set
Procedure:
-
Remove the old label (if it exists)
-
Change the filter insert
-
Apply the new label to the housing so that it is clearly visible
E.g.: 6 months
•
"Show" the next date to change
the filter in advance, 6 months
beforehand with a standard dia-
phragm, 3 months beforehand
with a chlorine resistant dia-
phragm.
•
Use a permanent marker or simi-
lar for this
Month: July (mark 7)
Year: 2014 (mark 14)
After the GiO module
Drain set/ Install free outlet for concentrate line
Summary of Contents for GiO Module
Page 14: ......